You are currently browsing the archives for the NDO's category.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Mar | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
- 1000 BASE-T (3)
- 1000BASE-LX (1)
- 1000BASE-SX (1)
- 100BASE-FX (2)
- 100BASE-SX (1)
- 100BASE-TX (3)
- 10BASE-FL (1)
- 10BASE-T (2)
- 10GBASE-EW (1)
- 10GBASE-LR (1)
- 10GBASE-LRM (1)
- 10GBASE-LW (1)
- 10GBASE-LX4 (1)
- 10GBASE-SR (1)
- 10GBASE-SW (1)
- 10GbE (1)
- 3D (2)
- 802.3af-2003 (1)
- Acoustics (1)
- Administration of drugs (1)
- Advance Carparking Systems (APS) (1)
- Advance parking meters (1)
- Advanced metering infrastructure (AMI) (5)
- Advertising (3)
- Air Conditioning (2)
- Air Insulated Metering Unit - AMU (1)
- Airport (2)
- AMRs (5)
- anaesthetic gas scavenging systems (AGSS) (1)
- Android (1)
- ANSI/CEA 709.1 (1)
- ANSI/ISA wireless standard (1)
- Apple (3)
- application bandwidth (1)
- Applications Domain (1)
- Arcnet (2)
- Asbestos (1)
- ASHRAE (2)
- ASHRAE 135-1995 (1)
- aspirating fire detection system (1)
- ATEX (1)
- Authorised Electricity Operator (AEO) (2)
- Automated Home initiative (TAHI) (1)
- Automatic monitoring and targeting (aM&T) (4)
- Automatic vehicle location (AVL) (1)
- automation wireless systems (1)
- AV displays (1)
- Aviation (2)
- BACnet (5)
- BACnet ARCNET (1)
- BACnet Ethernet (1)
- BACnet MS/TP (1)
- BACnet PTP (1)
- Balancing and Settlement Code (BSC) (1)
- Battery technology (2)
- batteryless switches (1)
- BEAMA (1)
- Bed status (1)
- bedhead services (1)
- BERR (2)
- Best practice (1)
- Billing And OSS Domain (1)
- BIM (building information modelling) (1)
- Biofuels (1)
- Biomass (4)
- Biometrics (3)
- Black Start (1)
- Blogs (1)
- Blu-ray video (4)
- Bluetooth (3)
- BNC (1)
- Braille (1)
- BRE (1)
- BREEAM (1)
- BREEAM Gulf (1)
- British Gas (2)
- British Standards (BSs) (1)
- Broadband internet (2)
- BS5839 (1)
- BUilding Control Bodies (BCBs) (1)
- Building Energy Efficiency Programme (BEEP) (1)
- Building Management System (BMS) (1)
- Building Management System Integrators (BMSi) (1)
- Building Performance Institute (1)
- Building regulations (3)
- Building Research Establishment (BRE) (1)
- Building services (1)
- building-automation systems (BAS) (1)
- Buildings (13)
- Business Intelligence and collaboration platform (1)
- Cameras - real time images (2)
- Canadian Standards Association (1)
- Car Park System (3)
- car technology (1)
- Carbon Capture and Storage (CCS) (3)
- Carbon Reduction Commitment (CRC) (3)
- Castell switching (6)
- Cat3 (1)
- Cat4 (1)
- cat5 (2)
- Cat5E (5)
- Cat6 (12)
- Cat6A (2)
- CCTV IR-illumination (1)
- CCTV Systems (1)
- CDMA devices (1)
- CEDIA (1)
- Changeable Message Signs (CMS) (1)
- Chief Fire Officers Association (1)
- CHP (1)
- Chrome (1)
- Chrome OS (2)
- Cisco (4)
- clean coal technology (CCT) (1)
- clean earth (1)
- Climate change (1)
- Climate Change Agreements (CCAs) (1)
- Climate Change Levy Exemption Certificate (LEC) (1)
- Climate control networks (1)
- Clinical report displays (1)
- Clinton Climate Initiative (CCI) (1)
- Close Proximity Signage (CPS) (1)
- Closed Circuit Television (CCTV) (5)
- Cloud Computing (1)
- Coarse Wavelength Division Multiplexing (CWDM) (1)
- Code for sustainable homes (1)
- Color Kinetics (1)
- colour rendering index (Ra) (1)
- commercial off-the-shelf (COTS) (1)
- Connection Agreement (1)
- Connection Charges (1)
- Connection Point (1)
- Construction (2)
- Construction workload (13)
- Consumers (1)
- contactless infrastructure (1)
- content encryption/decryption (1)
- Content management system (1)
- Content protection (1)
- Contestable Works (1)
- Control of Pollution (Oil Storage) (1)
- controls (1)
- converged IP core network (2)
- CoP1 (1)
- CoP10 (2)
- CoP2 (1)
- CoP3 (1)
- CoP5 (3)
- CUSC Bilateral Agreement (1)
- Customer (1)
- Customer Relationship Management [CRM] (1)
- customer satisfication (1)
- DAB (1)
- daily appointments (1)
- DALI (1)
- Dangerous Substances and Explosive Atmospheres Regulati (1)
- Dark Fiber (1)
- Dasboard (1)
- data carrying techniques (1)
- Data Centers (3)
- Data Centre Design (3)
- data centres (2)
- Data Protection Act (2)
- David Slade (4)
- Davmark (3)
- DeafBlind Communicator (DBC) (1)
- DECC (1)
- Department of Energy and Climate Change (2)
- Department of Health (1)
- design life cycle (1)
- desktop (1)
- Detailed Planning Data (DPD) (1)
- DH Estates and Facilities (1)
- Diesel (1)
- diesel or petroleum (1)
- Digital Radio (1)
- digital rights management (DRM) (1)
- digital signage (1)
- Digital Video Recorders (DVRs) (1)
- Digital Transition TV (2)
- direct digital control (DDC) (1)
- Display Energy Certificate (DEC) (1)
- Display Energy Certificates (DEC Certificates) (1)
- Displays (1)
- Distribution System (4)
- DLNA (Digital Network Living Alliance) (1)
- DMX (1)
- DNO (9)
- door-access systems (1)
- Double Skinned Tank (1)
- DTV (1)
- Duke Energy (1)
- duty of care (1)
- DVD (1)
- EA TS 133 (1)
- EA TS 41-24 (1)
- Earthing (1)
- Echelon (2)
- Eco-fund tariffs (1)
- ecommerce (1)
- EDC (Electronic Dispersion Compensation) (1)
- Edge-QAM subsystem (1)
- Education (4)
- EIKON (1)
- Electrical Equipment (Safety) Regulations (1)
- Electrical Equipment (Safety) Regulations 1994 (1)
- electrical supply (3)
- Electromagnetic compatibility (1)
- electronic article systems (EAS) (1)
- Electronic networks (1)
- electronic patient record (EPR) (2)
- embedded generator (2)
- EMC (1)
- Emissions Trading Scheme (1)
- Emissions Trading Scheme (ETS) (1)
- end-to-end (E2E) (1)
- Energy (10)
- energy controller (1)
- Energy efficiency commitment (EEC) (1)
- Energy harvesting (1)
- Energy Performance Certificates (EPC) (1)
- Energy Services Directive (1)
- ENERGY STAR (1)
- Energy Star program (1)
- Energywatch (1)
- Engineering (13)
- EnOcean Alliance (1)
- Eon (1)
- equal level far end crosstalk (ELFEXT) (1)
- equipotential earth (1)
- ERP (enterprise resource planning) (1)
- ESD flooring (1)
- ESTA (1)
- etailing (1)
- Ethernet (PoE) (1)
- EU Council (1)
- Eurocodes (1)
- European Emissions Trading System (EU-ETS) (1)
- European Smart Metering Industry Group (ESMIG) (1)
- European Union (1)
- Event (1)
- Export Meter (1)
- Export tariffs (1)
- Extended Environments Markup Language (EEML) (1)
- face geometry (1)
- Facilities strategy (1)
- facility management (1)
- fault level (1)
- fibre optic cabling (1)
- Fibre optic line drivers (1)
- Fibre Optic Standards (1)
- FibreAlert (1)
- Fingerprints (1)
- Fire alarm system - False Alarms (1)
- Fire detection (2)
- Fire performance test (1)
- Fire protection (2)
- Fire safety (4)
- Fire Safety Order 2005 (2)
- Fire Suppression (1)
- Firefox (1)
- fireman's lift (1)
- FITs - Feed-In Tariff (2)
- flexible screen (1)
- Footfall - people counting (1)
- Fuel oil (1)
- Furniture and Furnishings (Fire) (Safety) Regulations (1)
- G.hn (1)
- G54 (1)
- G59 (3)
- G74 (1)
- G75 (2)
- G83 (2)
- Galileo (1)
- Gas (3)
- gas distribution Network (2)
- gas distribution networks (GDNs) (1)
- Gas meters (4)
- Gas Safety (Installation and Use) Regulations 1998 (1)
- Gas smart metering (1)
- Gas suppliers (1)
- Gas Transporters (IGTs) (1)
- gateway (1)
- General (8)
- General Electric (1)
- Generation tariffs (1)
- Generator (4)
- Generator Star point Earthing (1)
- Genlyte group (1)
- Gigabit Interface Connector (GBIC) (1)
- Global Intelligent Utility Network (IUN) Coalition (1)
- Global Navigation Satellite System (GNSS) (1)
- global positioning system (GPS) (1)
- Global System for Mobile Communications (GSM) (1)
- Google (8)
- GPRS (1)
- Greater London Authority (1)
- Green buildings (7)
- Green Digital Charter (1)
- Ground source heat pumps (1)
- GUI (1)
- H&S (1)
- hand geometry (1)
- Hand scanners (1)
- Harmonics (1)
- hazardous explosive atmospheres (1)
- HDMI (4)
- HDTV (1)
- Head-end and head-end subsystems (1)
- health monitor systems (2)
- Healthcare (11)
- heating and ventilation control (1)
- High voltage distribution (1)
- Hochiki (1)
- Home Automation (8)
- Home automation network (HAN) (13)
- Home Energy Controller (HEC) (1)
- Home Entertainment Network (1)
- Home Information Packs (HIPs) (1)
- Home Office (1)
- Home Star (1)
- HomePlug Alliance (1)
- HomePNA (1)
- HomNet (3)
- hospital information system (HIS) (1)
- Host Bus Adapter (HBA) (1)
- Hotel Solutions (1)
- House in Multiple Occupation (HMO) (1)
- Housing (10)
- Housing Act 2004 (1)
- Housing Health and Safety Rating System (HHSRS) (1)
- HTML (HyperText Markup Language) (1)
- Human Rights Act (1)
- HV switchgear isolation (1)
- Hydroelectricity (1)
- IBM (5)
- ICT (1)
- IEC 555-2 (1)
- IEC61850 Ethernet-based services (1)
- IEEE 1473-L (1)
- IEEE 1621 (1)
- IEEE 802.15.4 (1)
- IEEE802.3 (1)
- IEEE802.3ae (1)
- IEEE802.3ak (1)
- IIT (19)
- in-home display (IHD) (1)
- Independent Distribution Network Operator (IDNO) (3)
- Information Commissioner (1)
- information-technology (IT) (3)
- Innovation (1)
- Integrated Access Device (IAD) (1)
- Integrated Metering System (2)
- Integration (16)
- Intel (1)
- Intelligent building (13)
- Intelligent Car Park System (2)
- Intelligent network (2)
- Intelligent transport systems (ITS) (1)
- internet fridge (2)
- internet oven (1)
- Internet video-on-demand service (2)
- internet washing machine (1)
- Internet-based television technology (2)
- intertripping (1)
- Intranet platform (1)
- Introduction (4)
- IP (Internet Protocol) (2)
- IP packet (1)
- IP Ratings (Ingress Protection) (1)
- IP video (1)
- IP-surveillance (1)
- IP/MPLS layer (1)
- iPhone (1)
- iPhone Apps (2)
- IPTV (3)
- IPv6 (1)
- iris patterns (1)
- ISA-100.11a (1)
- Island mode (1)
- islanding (1)
- ISO-16484-5 (1)
- IT (3)
- IT - Streaming (1)
- IT Network (power over Ethernet) (2)
- IT Tech explained (8)
- ITU-T G.9954 (1)
- Key Performance indicators (1)
- KNX EIB (1)
- LAN (1)
- LCD display (1)
- leak detection (1)
- LED Lighting (4)
- LEED (2)
- LG (1)
- LG Group (2)
- licensed premises (1)
- life cycle cost analysis (LCCA) (1)
- lifecycle (1)
- Lifetime freedom homes (4)
- Lifetime homes (2)
- Lighting (4)
- Lighting - Street (2)
- Lighting control (4)
- Lighting pollution (1)
- Linkedin (2)
- LinkLoss (1)
- Local authority powers (1)
- LonTalk (1)
- Lonworks (9)
- Loss Prevention Research Council (1)
- loudspeakers (1)
- Low Carbon Buildings Programme (1)
- Lumileds (1)
- m-commerce (1)
- Mac OS X (1)
- Marketing (6)
- Meal selection (1)
- Media Access Control (MAC) (1)
- Media Converter (1)
- Medical Devices Directives (1)
- Medical gas pipeline system (MGPS) (1)
- Medication requirements (1)
- MEIGaN - Medical Electrical Installation (2)
- metadata (1)
- Metal Core PCB (MCPCB) (1)
- Meter Operator (MOP) (1)
- metering (26)
- metering - Remote display (2)
- metropolitan area network (MAN) (1)
- MHRA (1)
- Micro CHP (2)
- micro-generation (2)
- microgeneration (1)
- Microgeneration Certification Scheme (MCS) (2)
- Microsoft (1)
- microwave (1)
- mission-critical (1)
- mobile phone (1)
- Modbus (1)
- Modbus/TCP (1)
- Motorola (1)
- Mozilla (1)
- MPAN (3)
- MPO cables (1)
- MPRN (Gas Meter Point Reference Number (2)
- MRI (1)
- Multi-Source Agreements (MSAs) (1)
- multi-touch application (1)
- Multilevel Discipline (1)
- Multiple earths (1)
- Multiple Terminations Push-Pull Latch (1)
- multiroom audio video (MRAV) (1)
- music (2)
- NAT (Network Address Translation) (1)
- NDO's (3)
- near end crosstalk (NEXT) (1)
- Near Field Communication (1)
- Network Infrastructure Domain (1)
- Network Integrator (1)
- Network Interface Cards (NIC) (1)
- Network Switch Cooling Solution (1)
- Networked Energy Services (NES) System (3)
- Nintendo (1)
- Node controller (1)
- Non Half Hourly (NHH) (1)
- Non-Contestable Works (1)
- Nonlinear loads (1)
- nurse-call (2)
- ODBC connections (1)
- Ofcom (2)
- Office of Government Commerce (OGC) (1)
- Ofgem (7)
- OLED (1)
- OLEDS (1)
- online shopping (1)
- Open Data Centre Alliance (1)
- OpenRF (1)
- operations support systems (OSS) (1)
- Optical Media Converters (1)
- Organic Recycling (1)
- Outdoor Spaces (1)
- oven (1)
- Oxy reduction system (1)
- P2/5 (1)
- P2/6 security (1)
- P28 (1)
- P29 (1)
- Pachube (1)
- Paknet (radio system) (1)
- Panasonic (1)
- parallel operation (1)
- Parking Guidance and Information (PGI) systems (1)
- Patient details (1)
- Patient entertainment (1)
- Patient monitoring (1)
- Patient's calling devices (1)
- PCI bus (1)
- Permit Scheme Operators (1)
- Philips (1)
- phosphorescent organic light-emitting diode (PHOLED) (1)
- Photovoltaic (PV) (5)
- Photovoltaics (3)
- PlayStation (1)
- point of common coupling (PCC) (1)
- point-of-sale (POS) (1)
- Power Distribution Units (PDUs) (1)
- Power line Carrier (PLC) (1)
- power outage (1)
- Power over Ethernet (PoE) (1)
- powerline (1)
- Project management (1)
- Proprietary Tank Systems (1)
- protection relays (1)
- protective earth (PE) (1)
- protective earth and neutral (PEN) (1)
- Public buildings (1)
- quality of service (QoS) (1)
- racks (1)
- Radio Frequency Identification (RFID) (1)
- radio frequency interference (RFI) (1)
- radiology information system (RIS) (1)
- Raised Floor Systems (1)
- Raised Floors (2)
- Rare earth minerals (1)
- real estate management (2)
- real-time (1)
- Real-time Location System (RTLS) (1)
- Realtime SMS (1)
- Reform (Fire Safety) Order 2005 (1)
- Regulatory Reform (Fire Safety) Order (2)
- Regulatory Reform (Fire Safety) Order 2005 (1)
- Remote access servers (RASs) (1)
- Remote Control (1)
- Remote Patient Monitoring (1)
- Remote Phosphor Technology (RPT) (1)
- Renewable energy (18)
- Renewable Energy Certificate (REC) (2)
- Renewable Energy Guarantee of Origin (REGO) (4)
- Renewable Obligation Certificates (ROC) (4)
- Renewable power (12)
- Renewable tariffs (6)
- residential (1)
- residential gateway (RG) (1)
- resiliency (1)
- Retail Price Index (RPI) (1)
- Retail solutions (2)
- Retrofit for Energy and Environmental Performance (REEP (1)
- Ring Main Unit - RMU's (1)
- RJ45 (1)
- RoHS (1)
- ROI (1)
- Royal and Sun Alliance (RSA) Insurance Group (1)
- RS-485 (1)
- S34 (1)
- Sales (1)
- Samsung (2)
- SCADA applications (1)
- Scotia Gas Networks (1)
- SEAIIT (1)
- section 20 building (2)
- Section 20 buildings (1)
- SecureMesh (1)
- security (3)
- Security networks (1)
- SERDES (1)
- Service Life Plan (1)
- Set Price Tariffs (1)
- set-top box (STB) (1)
- SharePoint (1)
- shielded twisted pair cable (STP) (1)
- Siemens (1)
- Signage (1)
- Small Form Factor Pluggable (SFP) (1)
- Small Scale Embedded Generator (SSEG) (3)
- Smart Buildings (2)
- Smart gas meters (2)
- Smart Grid Maturity Model (3)
- Smart Grid Technology (15)
- Smart homes (12)
- smart meters (22)
- Smart water meters (1)
- smoke extraction (1)
- SMS (2)
- Software (1)
- Solar PV (4)
- solution integration (SI) (2)
- Sony (1)
- Sound (1)
- Speech recognition (1)
- sprinkler (1)
- Sprinklers (1)
- Staff communications base (1)
- Staff-to-staff (emergency) (1)
- Standard Network Variable Type - SNVT (1)
- structural design (1)
- Subscriber Domain (1)
- substation automation (1)
- Substations (1)
- Sun Microsystems (1)
- Suspended Ceilings (1)
- Sustainability (7)
- Sustainable and Secure Buildings Act (1)
- SwitchAir (1)
- switchgear (2)
- System Frequency (1)
- System intergration (7)
- T1 or E1 communication lines (1)
- TDM-based protocols (1)
- Telecommunication Standardisation Bureau ITU (1)
- telecommunications (1)
- Telecommunications Industry Association (TIA) (1)
- thermostat (1)
- Thicknet (1)
- ThinNet (1)
- third harmonics (1)
- Third sector (1)
- Tidal renewable energy (1)
- Time Division Multiple Access (TDMA) (1)
- Time Synchronized Mesh Protocol (TSMP) (1)
- TiVo (2)
- TN-C (1)
- toilets (1)
- Total Generation Meter (1)
- touchless controls (1)
- Touchscreen (1)
- Touchscreen technology (2)
- Traffic Management Act (1)
- Transformer protection (1)
- Transformers - Dry (1)
- Transformers - Liquid filled (2)
- Transport and access networks (1)
- Tripping (1)
- Twitter (4)
- U.S. Environmental Protection Agency (1)
- un-lit fiber (1)
- Uncategorized (9)
- Uninterrupted Power Supply (UPS) (1)
- Universal Integrated Card (UICC) (1)
- Universal Powerline Bus (UPB) (1)
- UPnP (Universal Plug and Play) (1)
- UPS (1)
- USB (1)
- variable message signs (VMS) (1)
- venting system (1)
- video game consoles (1)
- Video on demand (VOD) (1)
- Video services middleware platform (1)
- video-on-demand (1)
- Virgin Media (2)
- virtualized network (1)
- Vodafone (1)
- Voice-Activated Controls (2)
- VoIP (3)
- Voltage Rise / Step Change (1)
- VPN (1)
- Wake On LAN (1)
- WAN (wide area network) (2)
- WAN PHY (1)
- washing machine (1)
- Water meter (2)
- water mist system (1)
- Wave (1)
- Wavelength Division Multiplexing (WDM) (1)
- Weatherproof LCD TV (1)
- Web 2.0 (3)
- Web-accessible control system (WACS) (2)
- Wi-Fi (6)
- wide area network (WAN) (1)
- Wii (1)
- Wind energy (8)
- Windows 8 (1)
- wireless communications (2)
- Wireless Gigabit (WiGig) Alliance (2)
- Wireless HD (1)
- Wireless sensor networks (WSNs) (2)
- Wireless USB (1)
- Wood-based Bio Fuels (1)
- X2 (1)
- Xbox (1)
- XENPAK (1)
- XFP (1)
- XML (extensible markup language) (2)
- xoserve (1)
- XPAK (1)
- Yardi (1)
- YouTube (1)
- Z-Wave (3)
- Zhaga LED standard (1)
- ZigBee (14)
- zone controllers (1)
- 30/03/2012: Asbestos Regulations - UK
- 10/11/2011: Distributed Smart data centres - working sun set to sun rise!
- 21/06/2011: Microsoft's next-gen OS - Windows 8
- 21/06/2011: Google - Chrome
- 21/06/2011: Mozilla - Firefox 5
- 13/01/2011: Samsung to invest in IBM chip research for mobile, other devices
- 04/01/2011: Online shoppers don't like "dynamic" pricing, report says
- 04/01/2011: 3D Blu-ray discs enter new year with some catching up to do
- 03/01/2011: China cuts rare earth exports
- 23/12/2010: SEAIIT Unleashed
Archive for the NDO's Category
TECHNICAL - Electrical Supply Standards and Other Documents
20/05/2009 by David Slade.
Standards and Other Documents
Electricity Safety, Quality and Continuity Regulations (ESQCR)
The Electricity Safety, Quality and Continuity Regulations 2002 - Statutory Instrument Number 2665 -HMSO ISBN 0-11-042920-6 abbreviated to ESQCR in this document.
[Available FoC on DTI web site: www.dti.gov.uk]
BS EN 50160 Voltage characteristics of electricity supplied by public distribution systems
BS 7671: 2001 Requirements for Electrical Installations IEE Wiring Regulations 17th Edition.
Distribution Codes
a) The Distribution Code of the DNOs of Great Britain
[Available FoC on Distribution Code website www.dcode.org.uk]
b) The Distribution Code for Northern Ireland
Grid Codes
a) The Grid Code for England and Wales
b) The Grid Code for Scotland
c) The Grid Code for Northern Ireland
Engineering Recommendation G5/4-1 (2001)
Planning levels for harmonic voltage distortion and the connection of nonlinear equipment to transmission and distribution networks in the United Kingdom.
Engineering Recommendation G12/3
Requirements for the application of protective multiple earthing to low voltage
networks.
Engineering Recommendation G59/1, Amendment 1 (1995)
Recommendations for the Connection of Embedded Generating Plant to the Regional Electricity Companies’ Distribution Systems.
Engineering Recommendation G74
Procedures to meet the requirements of IEC 909 for the calculation of short circuit currents in three phase AC power systems.
Engineering Recommendation G75/1, (2002)
Recommendations for the connection embedded generation plant to public distribution networks above 20kV or with outputs over 5MW.
Engineering Recommendation G83/1-1 (2003)
Recommendations for the connection of small-scale embedded generators (up to 16A per phase) in parallel with public low-voltage distribution networks.
Engineering Recommendation P2/6
Security of Supply
EM7907
Distribution planning standards of voltage and of security of supply. (Parts of
Scottish Hydro Electric Power Distribution Ltd Area)
Engineering Recommendation P14
Preferred switchgear ratings.
Engineering Recommendation P24
AC traction supplies to British Rail.
Engineering Recommendation P25
The short circuit characteristics of electricity boards low voltage distribution
networks and the co-ordination of overcurrent protective devices on 230V single phase supplies up to 100A.
Engineering Recommendation P26/1
The estimation of the maximum prospective short circuit current for three phase 415V supplies.Engineering Recommendation P28 (1989)
Planning limits for voltage fluctuations caused by industrial, commercial and domestic equipment in the United Kingdom.
Engineering Recommendation P29 (1990)
Planning limits for voltage unbalance in the UK for 132 kV and below.
Electricity Association Engineering Recommendation S34 (1986)
A guide for assessing the rise of earth potential at substation sites, 1986.
Electricity Association Technical Specification (EA TS) 41-24 November 2009
Guidelines for the design, installation, testing and maintenance of main earthing systems in substations,.
Engineering Technical Report No. 113, Revision 1 (1995)
Notes of Guidance for the Protection of Embedded Generating Plant up to 5 MW for Operation in Parallel with Public Electricity Suppliers’ distribution systems.
All Engineering Recommendations are available from:
Energy Networks Association
18 Stanhope Place
Marble Arch
London
W2 2HH
Tel: 0207 706 5100
Fax: 0207 706 5101
www.energynetworks.org.uk
Posted in P29, P28, S34, EA TS 41-24, EA TS 133, P2/5, G74, G83, G59, G75, G54, NDO's | No Comments »
Electrical Grid Connected Generation & DNO’s
20/05/2009 by David Slade.
Grid Connected Generation
Terminology to Start
• Developer
– You!
• Distribution Network Owner/Operator (DNO)
– Owns, maintains, develops and operates the physical network
– SP Manweb, United Utilities in the North West
– Not the slightest bit interested in selling or buying energy from you
• Electricity Supplier
– Party to contract with to buy & sell energy
– Npower, PowerGen, Scottish Power, British Gas, etc…
– Not the slightest bit interested in the physical connection
• Ofgem
– Electricity and Gas Market regulator
– Also administers the ROC process if your technology is eligible
Just Some of the Legal Issues
• If grid connected, then it is a legal requirement to have permission to connect & operate any form of generation
– Needs to have a DNO connection agreement
– Needs to have correct electrical protection
– Needs to have correct earthing
– Needs to have an export meter (if exporting)
– Needs to have a supplier contract (if exporting)
• D-code : Distribution Code for UK Distribution Networks
• G-code : Grid Code for UK Transmission Networks
• Electricity at Work Regulations
Engineering Recommendations
• Technical connection requirements are detailed in the Engineering Recommendations
– DNOs view these as “Rules” rather than just “Recommendations”
• G83: Less than 6kW (16A/phase)
– No connection agreement required but must notify DNO once on
• G59: Less than 5MW and less than 20kV connection
– Must have a connection agreement
• G75: Anything else up to 50MW or transmission connected
– Must have a connection agreement
DNO Responsibilities
• Statutory obligations under the terms of their licence
– Secure operation and development of the network
– Safe & reliable operation of the network
– Ensure fair and equal access to the network
– Least cost options for connection
– Lifetime of network not just your connection
• Must respond to a connection application within 90 days. Remember, they’re not out to get you, but they have responsibilities too!
Electrical Connection Issues
• Technical issues to be considered during connection study/investigation
– Thermal limits
– Voltage limits & step change
– Reverse power-flows through transformers
– Short-circuit rating of switchgear
– Protection arrangements & co-ordination
– Harmonics & Power Quality
– Transient stability (usually only for larger generators)
• Energy Metering
• There will be the need to provide a reasonable level of data on the generator and the site connections
• The connection and protection will need to be witnessed and approved by the DNO in order to complete the connection process
Network Capacity Issues
• The Distribution Network has real limits
• Due to load growth and the drive towards maximising use of existing assets, available headroom is often quite limited
– Cable ratings reached during peak load
– Voltage drop/rise reached
– Circuit breaker short-circuit limits reached
• The Capacity Race
– It is not just fiction it is unfortunately real in some locations
– First-come, first-served & Interactive Applications
– There are some solutions but most do add cost and complexity
Rule of Thumb Connection Capacities
< 6kW 240V
< 1MW 415V (3-phase)
< 1-10MW 11kV
< 30MW 33kV
< 50MW 66kV/132kV
> 50MW 132kV upwards & National Grid interfaces…
As with any project, the bigger the project, it is important that you have the right level of advice or expertise to de-risk the project.
So, what do I do to get connected?
• Contact your friendly neighbourhood consultant ☺
But seriously:
• Start with a rough idea of what you want to do
– Check that your site can fit it and you can afford it
– Check that all other regulatory issues are okay
• Have an informal “chat” about connection possibilities with DNO generator connections or knowledgeable person
– Check that your initial idea still sounds sensible
When contacting the DNO
• Contact DNO – generation connections (NOT Demand)
– The connection process will be more likely to be successful with good communication between the developer and the local DNO
• Determine your connection route: G83, G59 or G75
– This may have costs associated with it
• Be prepared for a process not just rubber stamping
– Planning & Information phase
– Detailed Design phase
– Installation phase
– Testing & Commissioning phase
Working with the DNO
• Seek an early meeting to discuss your project
– Outline the scheme
– Discuss the DNO’s process for connections
– Request an indicative connection design and budgetary cost estimate with a split between contestable & non-contestable works
• Review your project
– Submit the formal connection application
– Remember to accept the connection offer!
• Submission of data to DNO
– Make sure that this is appropriate and timely to avoid delays
• Testing and Commissioning
– Plan in advance to avoid delays as staff will usually be quite busy
Connection Charges
• Application Fees
– These vary between DNO and size and voltage level of project
– Complex projects may involve additional fees
• Connection Assets
– Developer will be expected to pay full costs for all sole-use assets
• Generation Use of System Charges
– Site dependent & in lieu of network reinforcement costs
– Each DNO has own policy in-line with Ofgem guidance
Competition in Connections
• Developer as two options:
– Get the DNO to do all works necessary for the connection
– 3rd party to provide all contestable works which DNO then adopts
• Contestable Works
– Supply & installation of any new assets up to the point of connection to the existing network. Adoption agreement required.
• Non-Contestable Works
– Any studies, reinforcement or installation on existing network
– Design & specification of any new assets, consents & way-leaves
• Note: The DNO will not get involved in any “on-site” works
Finally, just when you thought it was too easy
Other non-electrical issues still need to be resolved
– Planning Permission?
– EIA, Emissions?
– Health & Safety?
– Commercial?
– Installation & transport?
– CDM?
Posted in G75, Connection Charges, Contestable Works, Non-Contestable Works, G59, G83, Energy, metering, Ofgem, NDO's | No Comments »
Centrica has bought a 20% stake in EDF’s nuclear business
15/05/2009 by David Slade.
British Gas owner Centrica has bought a 20% stake in EDF’s nuclear business - formerly British Energy - for £2.3bn while EDF has reciprocated by buying a controlling stake in Centrica’s Belgian supply business SPE for £1.2bn.
The deal will make Centrica an equity stakeholder in EDF’s existing and any future nuclear business in the UK
EDF and Centrica will also form an 80/20 joint venture to pursue a planned programme to build four new nuclear power stations in the UK. Finally, the EDF Group will acquire Centrica’s 51%. stake in Belgian generation and supply business SPE.
Centrica’s bid will invest £2.3bn for the 20% in Lake Acquisitions, the vehicle through which EDF acquired British Energy, 6% less than the price EDF offered in January, which also gives Centrica 20% of the company’s liabilities.
Chairman and Chief Executive of EDF, Pierre Gadonneix, said: “This transaction, part of the group’s strategy of developing its positions in Europe, will enable leading British generator, Centrica, alongside EDF, to take part in the re-launch of nuclear energy in the United Kingdom through an industrial partnership in a form already pioneered by EDF in China and the US.
“This transaction will also help balance both the generation and supply businesses of EDF Energy. The asset swap in this deal will also see the EDF group reinforce its Benelux presence by becoming the second-largest generator in Belgium,” he said.
Centrica will have a 20% stake of the available power from the British Energy fleet, and buy 18TWh of power at market prices over five years from 2011.
The companies plan to construct, operate and decommission four European Pressurised Reactors, designed by Areva. Two reactors are under construction - one at Flamanville on the north French coast, and a second at Olkiluoto in Finaland.
Chairman of Centrica, Roger Carr, said: “The deal represents good value for Centrica shareholders, improves the strategic balance of our business and further underpins our green energy credentials.
“The attractive price secured for the sale of SPE will help preserve our balance sheet firepower as we focus the group on growth opportunities in the UK and North America,” he said.
Posted in NDO's | No Comments »