You are currently browsing the archives for the TN-C category.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Mar | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
- 1000 BASE-T (3)
- 1000BASE-LX (1)
- 1000BASE-SX (1)
- 100BASE-FX (2)
- 100BASE-SX (1)
- 100BASE-TX (3)
- 10BASE-FL (1)
- 10BASE-T (2)
- 10GBASE-EW (1)
- 10GBASE-LR (1)
- 10GBASE-LRM (1)
- 10GBASE-LW (1)
- 10GBASE-LX4 (1)
- 10GBASE-SR (1)
- 10GBASE-SW (1)
- 10GbE (1)
- 3D (2)
- 802.3af-2003 (1)
- Acoustics (1)
- Administration of drugs (1)
- Advance Carparking Systems (APS) (1)
- Advance parking meters (1)
- Advanced metering infrastructure (AMI) (5)
- Advertising (3)
- Air Conditioning (2)
- Air Insulated Metering Unit - AMU (1)
- Airport (2)
- AMRs (5)
- anaesthetic gas scavenging systems (AGSS) (1)
- Android (1)
- ANSI/CEA 709.1 (1)
- ANSI/ISA wireless standard (1)
- Apple (3)
- application bandwidth (1)
- Applications Domain (1)
- Arcnet (2)
- Asbestos (1)
- ASHRAE (2)
- ASHRAE 135-1995 (1)
- aspirating fire detection system (1)
- ATEX (1)
- Authorised Electricity Operator (AEO) (2)
- Automated Home initiative (TAHI) (1)
- Automatic monitoring and targeting (aM&T) (4)
- Automatic vehicle location (AVL) (1)
- automation wireless systems (1)
- AV displays (1)
- Aviation (2)
- BACnet (5)
- BACnet ARCNET (1)
- BACnet Ethernet (1)
- BACnet MS/TP (1)
- BACnet PTP (1)
- Balancing and Settlement Code (BSC) (1)
- Battery technology (2)
- batteryless switches (1)
- BEAMA (1)
- Bed status (1)
- bedhead services (1)
- BERR (2)
- Best practice (1)
- Billing And OSS Domain (1)
- BIM (building information modelling) (1)
- Biofuels (1)
- Biomass (4)
- Biometrics (3)
- Black Start (1)
- Blogs (1)
- Blu-ray video (4)
- Bluetooth (3)
- BNC (1)
- Braille (1)
- BRE (1)
- BREEAM (1)
- BREEAM Gulf (1)
- British Gas (2)
- British Standards (BSs) (1)
- Broadband internet (2)
- BS5839 (1)
- BUilding Control Bodies (BCBs) (1)
- Building Energy Efficiency Programme (BEEP) (1)
- Building Management System (BMS) (1)
- Building Management System Integrators (BMSi) (1)
- Building Performance Institute (1)
- Building regulations (3)
- Building Research Establishment (BRE) (1)
- Building services (1)
- building-automation systems (BAS) (1)
- Buildings (13)
- Business Intelligence and collaboration platform (1)
- Cameras - real time images (2)
- Canadian Standards Association (1)
- Car Park System (3)
- car technology (1)
- Carbon Capture and Storage (CCS) (3)
- Carbon Reduction Commitment (CRC) (3)
- Castell switching (6)
- Cat3 (1)
- Cat4 (1)
- cat5 (2)
- Cat5E (5)
- Cat6 (12)
- Cat6A (2)
- CCTV IR-illumination (1)
- CCTV Systems (1)
- CDMA devices (1)
- CEDIA (1)
- Changeable Message Signs (CMS) (1)
- Chief Fire Officers Association (1)
- CHP (1)
- Chrome (1)
- Chrome OS (2)
- Cisco (4)
- clean coal technology (CCT) (1)
- clean earth (1)
- Climate change (1)
- Climate Change Agreements (CCAs) (1)
- Climate Change Levy Exemption Certificate (LEC) (1)
- Climate control networks (1)
- Clinical report displays (1)
- Clinton Climate Initiative (CCI) (1)
- Close Proximity Signage (CPS) (1)
- Closed Circuit Television (CCTV) (5)
- Cloud Computing (1)
- Coarse Wavelength Division Multiplexing (CWDM) (1)
- Code for sustainable homes (1)
- Color Kinetics (1)
- colour rendering index (Ra) (1)
- commercial off-the-shelf (COTS) (1)
- Connection Agreement (1)
- Connection Charges (1)
- Connection Point (1)
- Construction (2)
- Construction workload (13)
- Consumers (1)
- contactless infrastructure (1)
- content encryption/decryption (1)
- Content management system (1)
- Content protection (1)
- Contestable Works (1)
- Control of Pollution (Oil Storage) (1)
- controls (1)
- converged IP core network (2)
- CoP1 (1)
- CoP10 (2)
- CoP2 (1)
- CoP3 (1)
- CoP5 (3)
- CUSC Bilateral Agreement (1)
- Customer (1)
- Customer Relationship Management [CRM] (1)
- customer satisfication (1)
- DAB (1)
- daily appointments (1)
- DALI (1)
- Dangerous Substances and Explosive Atmospheres Regulati (1)
- Dark Fiber (1)
- Dasboard (1)
- data carrying techniques (1)
- Data Centers (3)
- Data Centre Design (3)
- data centres (2)
- Data Protection Act (2)
- David Slade (4)
- Davmark (3)
- DeafBlind Communicator (DBC) (1)
- DECC (1)
- Department of Energy and Climate Change (2)
- Department of Health (1)
- design life cycle (1)
- desktop (1)
- Detailed Planning Data (DPD) (1)
- DH Estates and Facilities (1)
- Diesel (1)
- diesel or petroleum (1)
- Digital Radio (1)
- digital rights management (DRM) (1)
- digital signage (1)
- Digital Video Recorders (DVRs) (1)
- Digital Transition TV (2)
- direct digital control (DDC) (1)
- Display Energy Certificate (DEC) (1)
- Display Energy Certificates (DEC Certificates) (1)
- Displays (1)
- Distribution System (4)
- DLNA (Digital Network Living Alliance) (1)
- DMX (1)
- DNO (9)
- door-access systems (1)
- Double Skinned Tank (1)
- DTV (1)
- Duke Energy (1)
- duty of care (1)
- DVD (1)
- EA TS 133 (1)
- EA TS 41-24 (1)
- Earthing (1)
- Echelon (2)
- Eco-fund tariffs (1)
- ecommerce (1)
- EDC (Electronic Dispersion Compensation) (1)
- Edge-QAM subsystem (1)
- Education (4)
- EIKON (1)
- Electrical Equipment (Safety) Regulations (1)
- Electrical Equipment (Safety) Regulations 1994 (1)
- electrical supply (3)
- Electromagnetic compatibility (1)
- electronic article systems (EAS) (1)
- Electronic networks (1)
- electronic patient record (EPR) (2)
- embedded generator (2)
- EMC (1)
- Emissions Trading Scheme (1)
- Emissions Trading Scheme (ETS) (1)
- end-to-end (E2E) (1)
- Energy (10)
- energy controller (1)
- Energy efficiency commitment (EEC) (1)
- Energy harvesting (1)
- Energy Performance Certificates (EPC) (1)
- Energy Services Directive (1)
- ENERGY STAR (1)
- Energy Star program (1)
- Energywatch (1)
- Engineering (13)
- EnOcean Alliance (1)
- Eon (1)
- equal level far end crosstalk (ELFEXT) (1)
- equipotential earth (1)
- ERP (enterprise resource planning) (1)
- ESD flooring (1)
- ESTA (1)
- etailing (1)
- Ethernet (PoE) (1)
- EU Council (1)
- Eurocodes (1)
- European Emissions Trading System (EU-ETS) (1)
- European Smart Metering Industry Group (ESMIG) (1)
- European Union (1)
- Event (1)
- Export Meter (1)
- Export tariffs (1)
- Extended Environments Markup Language (EEML) (1)
- face geometry (1)
- Facilities strategy (1)
- facility management (1)
- fault level (1)
- fibre optic cabling (1)
- Fibre optic line drivers (1)
- Fibre Optic Standards (1)
- FibreAlert (1)
- Fingerprints (1)
- Fire alarm system - False Alarms (1)
- Fire detection (2)
- Fire performance test (1)
- Fire protection (2)
- Fire safety (4)
- Fire Safety Order 2005 (2)
- Fire Suppression (1)
- Firefox (1)
- fireman's lift (1)
- FITs - Feed-In Tariff (2)
- flexible screen (1)
- Footfall - people counting (1)
- Fuel oil (1)
- Furniture and Furnishings (Fire) (Safety) Regulations (1)
- G.hn (1)
- G54 (1)
- G59 (3)
- G74 (1)
- G75 (2)
- G83 (2)
- Galileo (1)
- Gas (3)
- gas distribution Network (2)
- gas distribution networks (GDNs) (1)
- Gas meters (4)
- Gas Safety (Installation and Use) Regulations 1998 (1)
- Gas smart metering (1)
- Gas suppliers (1)
- Gas Transporters (IGTs) (1)
- gateway (1)
- General (8)
- General Electric (1)
- Generation tariffs (1)
- Generator (4)
- Generator Star point Earthing (1)
- Genlyte group (1)
- Gigabit Interface Connector (GBIC) (1)
- Global Intelligent Utility Network (IUN) Coalition (1)
- Global Navigation Satellite System (GNSS) (1)
- global positioning system (GPS) (1)
- Global System for Mobile Communications (GSM) (1)
- Google (8)
- GPRS (1)
- Greater London Authority (1)
- Green buildings (7)
- Green Digital Charter (1)
- Ground source heat pumps (1)
- GUI (1)
- H&S (1)
- hand geometry (1)
- Hand scanners (1)
- Harmonics (1)
- hazardous explosive atmospheres (1)
- HDMI (4)
- HDTV (1)
- Head-end and head-end subsystems (1)
- health monitor systems (2)
- Healthcare (11)
- heating and ventilation control (1)
- High voltage distribution (1)
- Hochiki (1)
- Home Automation (8)
- Home automation network (HAN) (13)
- Home Energy Controller (HEC) (1)
- Home Entertainment Network (1)
- Home Information Packs (HIPs) (1)
- Home Office (1)
- Home Star (1)
- HomePlug Alliance (1)
- HomePNA (1)
- HomNet (3)
- hospital information system (HIS) (1)
- Host Bus Adapter (HBA) (1)
- Hotel Solutions (1)
- House in Multiple Occupation (HMO) (1)
- Housing (10)
- Housing Act 2004 (1)
- Housing Health and Safety Rating System (HHSRS) (1)
- HTML (HyperText Markup Language) (1)
- Human Rights Act (1)
- HV switchgear isolation (1)
- Hydroelectricity (1)
- IBM (5)
- ICT (1)
- IEC 555-2 (1)
- IEC61850 Ethernet-based services (1)
- IEEE 1473-L (1)
- IEEE 1621 (1)
- IEEE 802.15.4 (1)
- IEEE802.3 (1)
- IEEE802.3ae (1)
- IEEE802.3ak (1)
- IIT (19)
- in-home display (IHD) (1)
- Independent Distribution Network Operator (IDNO) (3)
- Information Commissioner (1)
- information-technology (IT) (3)
- Innovation (1)
- Integrated Access Device (IAD) (1)
- Integrated Metering System (2)
- Integration (16)
- Intel (1)
- Intelligent building (13)
- Intelligent Car Park System (2)
- Intelligent network (2)
- Intelligent transport systems (ITS) (1)
- internet fridge (2)
- internet oven (1)
- Internet video-on-demand service (2)
- internet washing machine (1)
- Internet-based television technology (2)
- intertripping (1)
- Intranet platform (1)
- Introduction (4)
- IP (Internet Protocol) (2)
- IP packet (1)
- IP Ratings (Ingress Protection) (1)
- IP video (1)
- IP-surveillance (1)
- IP/MPLS layer (1)
- iPhone (1)
- iPhone Apps (2)
- IPTV (3)
- IPv6 (1)
- iris patterns (1)
- ISA-100.11a (1)
- Island mode (1)
- islanding (1)
- ISO-16484-5 (1)
- IT (3)
- IT - Streaming (1)
- IT Network (power over Ethernet) (2)
- IT Tech explained (8)
- ITU-T G.9954 (1)
- Key Performance indicators (1)
- KNX EIB (1)
- LAN (1)
- LCD display (1)
- leak detection (1)
- LED Lighting (4)
- LEED (2)
- LG (1)
- LG Group (2)
- licensed premises (1)
- life cycle cost analysis (LCCA) (1)
- lifecycle (1)
- Lifetime freedom homes (4)
- Lifetime homes (2)
- Lighting (4)
- Lighting - Street (2)
- Lighting control (4)
- Lighting pollution (1)
- Linkedin (2)
- LinkLoss (1)
- Local authority powers (1)
- LonTalk (1)
- Lonworks (9)
- Loss Prevention Research Council (1)
- loudspeakers (1)
- Low Carbon Buildings Programme (1)
- Lumileds (1)
- m-commerce (1)
- Mac OS X (1)
- Marketing (6)
- Meal selection (1)
- Media Access Control (MAC) (1)
- Media Converter (1)
- Medical Devices Directives (1)
- Medical gas pipeline system (MGPS) (1)
- Medication requirements (1)
- MEIGaN - Medical Electrical Installation (2)
- metadata (1)
- Metal Core PCB (MCPCB) (1)
- Meter Operator (MOP) (1)
- metering (26)
- metering - Remote display (2)
- metropolitan area network (MAN) (1)
- MHRA (1)
- Micro CHP (2)
- micro-generation (2)
- microgeneration (1)
- Microgeneration Certification Scheme (MCS) (2)
- Microsoft (1)
- microwave (1)
- mission-critical (1)
- mobile phone (1)
- Modbus (1)
- Modbus/TCP (1)
- Motorola (1)
- Mozilla (1)
- MPAN (3)
- MPO cables (1)
- MPRN (Gas Meter Point Reference Number (2)
- MRI (1)
- Multi-Source Agreements (MSAs) (1)
- multi-touch application (1)
- Multilevel Discipline (1)
- Multiple earths (1)
- Multiple Terminations Push-Pull Latch (1)
- multiroom audio video (MRAV) (1)
- music (2)
- NAT (Network Address Translation) (1)
- NDO's (3)
- near end crosstalk (NEXT) (1)
- Near Field Communication (1)
- Network Infrastructure Domain (1)
- Network Integrator (1)
- Network Interface Cards (NIC) (1)
- Network Switch Cooling Solution (1)
- Networked Energy Services (NES) System (3)
- Nintendo (1)
- Node controller (1)
- Non Half Hourly (NHH) (1)
- Non-Contestable Works (1)
- Nonlinear loads (1)
- nurse-call (2)
- ODBC connections (1)
- Ofcom (2)
- Office of Government Commerce (OGC) (1)
- Ofgem (7)
- OLED (1)
- OLEDS (1)
- online shopping (1)
- Open Data Centre Alliance (1)
- OpenRF (1)
- operations support systems (OSS) (1)
- Optical Media Converters (1)
- Organic Recycling (1)
- Outdoor Spaces (1)
- oven (1)
- Oxy reduction system (1)
- P2/5 (1)
- P2/6 security (1)
- P28 (1)
- P29 (1)
- Pachube (1)
- Paknet (radio system) (1)
- Panasonic (1)
- parallel operation (1)
- Parking Guidance and Information (PGI) systems (1)
- Patient details (1)
- Patient entertainment (1)
- Patient monitoring (1)
- Patient's calling devices (1)
- PCI bus (1)
- Permit Scheme Operators (1)
- Philips (1)
- phosphorescent organic light-emitting diode (PHOLED) (1)
- Photovoltaic (PV) (5)
- Photovoltaics (3)
- PlayStation (1)
- point of common coupling (PCC) (1)
- point-of-sale (POS) (1)
- Power Distribution Units (PDUs) (1)
- Power line Carrier (PLC) (1)
- power outage (1)
- Power over Ethernet (PoE) (1)
- powerline (1)
- Project management (1)
- Proprietary Tank Systems (1)
- protection relays (1)
- protective earth (PE) (1)
- protective earth and neutral (PEN) (1)
- Public buildings (1)
- quality of service (QoS) (1)
- racks (1)
- Radio Frequency Identification (RFID) (1)
- radio frequency interference (RFI) (1)
- radiology information system (RIS) (1)
- Raised Floor Systems (1)
- Raised Floors (2)
- Rare earth minerals (1)
- real estate management (2)
- real-time (1)
- Real-time Location System (RTLS) (1)
- Realtime SMS (1)
- Reform (Fire Safety) Order 2005 (1)
- Regulatory Reform (Fire Safety) Order (2)
- Regulatory Reform (Fire Safety) Order 2005 (1)
- Remote access servers (RASs) (1)
- Remote Control (1)
- Remote Patient Monitoring (1)
- Remote Phosphor Technology (RPT) (1)
- Renewable energy (18)
- Renewable Energy Certificate (REC) (2)
- Renewable Energy Guarantee of Origin (REGO) (4)
- Renewable Obligation Certificates (ROC) (4)
- Renewable power (12)
- Renewable tariffs (6)
- residential (1)
- residential gateway (RG) (1)
- resiliency (1)
- Retail Price Index (RPI) (1)
- Retail solutions (2)
- Retrofit for Energy and Environmental Performance (REEP (1)
- Ring Main Unit - RMU's (1)
- RJ45 (1)
- RoHS (1)
- ROI (1)
- Royal and Sun Alliance (RSA) Insurance Group (1)
- RS-485 (1)
- S34 (1)
- Sales (1)
- Samsung (2)
- SCADA applications (1)
- Scotia Gas Networks (1)
- SEAIIT (1)
- section 20 building (2)
- Section 20 buildings (1)
- SecureMesh (1)
- security (3)
- Security networks (1)
- SERDES (1)
- Service Life Plan (1)
- Set Price Tariffs (1)
- set-top box (STB) (1)
- SharePoint (1)
- shielded twisted pair cable (STP) (1)
- Siemens (1)
- Signage (1)
- Small Form Factor Pluggable (SFP) (1)
- Small Scale Embedded Generator (SSEG) (3)
- Smart Buildings (2)
- Smart gas meters (2)
- Smart Grid Maturity Model (3)
- Smart Grid Technology (15)
- Smart homes (12)
- smart meters (22)
- Smart water meters (1)
- smoke extraction (1)
- SMS (2)
- Software (1)
- Solar PV (4)
- solution integration (SI) (2)
- Sony (1)
- Sound (1)
- Speech recognition (1)
- sprinkler (1)
- Sprinklers (1)
- Staff communications base (1)
- Staff-to-staff (emergency) (1)
- Standard Network Variable Type - SNVT (1)
- structural design (1)
- Subscriber Domain (1)
- substation automation (1)
- Substations (1)
- Sun Microsystems (1)
- Suspended Ceilings (1)
- Sustainability (7)
- Sustainable and Secure Buildings Act (1)
- SwitchAir (1)
- switchgear (2)
- System Frequency (1)
- System intergration (7)
- T1 or E1 communication lines (1)
- TDM-based protocols (1)
- Telecommunication Standardisation Bureau ITU (1)
- telecommunications (1)
- Telecommunications Industry Association (TIA) (1)
- thermostat (1)
- Thicknet (1)
- ThinNet (1)
- third harmonics (1)
- Third sector (1)
- Tidal renewable energy (1)
- Time Division Multiple Access (TDMA) (1)
- Time Synchronized Mesh Protocol (TSMP) (1)
- TiVo (2)
- TN-C (1)
- toilets (1)
- Total Generation Meter (1)
- touchless controls (1)
- Touchscreen (1)
- Touchscreen technology (2)
- Traffic Management Act (1)
- Transformer protection (1)
- Transformers - Dry (1)
- Transformers - Liquid filled (2)
- Transport and access networks (1)
- Tripping (1)
- Twitter (4)
- U.S. Environmental Protection Agency (1)
- un-lit fiber (1)
- Uncategorized (9)
- Uninterrupted Power Supply (UPS) (1)
- Universal Integrated Card (UICC) (1)
- Universal Powerline Bus (UPB) (1)
- UPnP (Universal Plug and Play) (1)
- UPS (1)
- USB (1)
- variable message signs (VMS) (1)
- venting system (1)
- video game consoles (1)
- Video on demand (VOD) (1)
- Video services middleware platform (1)
- video-on-demand (1)
- Virgin Media (2)
- virtualized network (1)
- Vodafone (1)
- Voice-Activated Controls (2)
- VoIP (3)
- Voltage Rise / Step Change (1)
- VPN (1)
- Wake On LAN (1)
- WAN (wide area network) (2)
- WAN PHY (1)
- washing machine (1)
- Water meter (2)
- water mist system (1)
- Wave (1)
- Wavelength Division Multiplexing (WDM) (1)
- Weatherproof LCD TV (1)
- Web 2.0 (3)
- Web-accessible control system (WACS) (2)
- Wi-Fi (6)
- wide area network (WAN) (1)
- Wii (1)
- Wind energy (8)
- Windows 8 (1)
- wireless communications (2)
- Wireless Gigabit (WiGig) Alliance (2)
- Wireless HD (1)
- Wireless sensor networks (WSNs) (2)
- Wireless USB (1)
- Wood-based Bio Fuels (1)
- X2 (1)
- Xbox (1)
- XENPAK (1)
- XFP (1)
- XML (extensible markup language) (2)
- xoserve (1)
- XPAK (1)
- Yardi (1)
- YouTube (1)
- Z-Wave (3)
- Zhaga LED standard (1)
- ZigBee (14)
- zone controllers (1)
- 30/03/2012: Asbestos Regulations - UK
- 10/11/2011: Distributed Smart data centres - working sun set to sun rise!
- 21/06/2011: Microsoft's next-gen OS - Windows 8
- 21/06/2011: Google - Chrome
- 21/06/2011: Mozilla - Firefox 5
- 13/01/2011: Samsung to invest in IBM chip research for mobile, other devices
- 04/01/2011: Online shoppers don't like "dynamic" pricing, report says
- 04/01/2011: 3D Blu-ray discs enter new year with some catching up to do
- 03/01/2011: China cuts rare earth exports
- 23/12/2010: SEAIIT Unleashed
Archive for the TN-C Category
A Systems Approach to Earthing
13/06/2009 by David Slade.
Introduction
Earthing of installations and equipment is an issue that crosses the boundaries of the various disciplines involved in the construction and equipping of a modern commercial or industrial building. Construction engineers need to talk with instrumentation engineers and IT professionals need to discuss matters with electrical engineers and so on. Sometimes, however, these individual engineers do not speak the same technical language or are not even aware of the needs of each other’s installations. In this document an overall earthing approach is presented to serve as a basic guideline for earthing and interference suppression that can be used by multi-disciplinary teams.
In general any earthing system needs to satisfy three demands:
- Lightning and short circuit: the earthing system must protect the occupants, prevent direct damage such as fire, flashover or explosions due to a direct lightning strike and overheating due to a short-circuit current.
- Safety: the earthing system must conduct lightning and short-circuit currents without introducing intolerable step-voltage and touch-voltages.
- Equipment protection and functionality: the earthing system must protect electronics by providing a low impedance path to interconnect equipment. Proper cable routing, zoning and shielding are important aspects and serve the purpose of preventing sources of disturbance from interfering with the operation of electrical equipment.
Although requirements for these three aspects are often specified separately, the implementation of them requires an integrated systems approach.
A systems approach
The original purpose of the protective earth was to ensure the safety of people and property within the zone served by the earthing system. This requires a high current capacity path with relatively low impedance at the fundamental frequency so that voltages developed under high fault current conditions are not hazardous.
It is very easy to make a good low impedance connection to ground. All that is needed is a high conductivity, corrosion resistant conductor (copper is a good choice) buried in the earth at such a depth that it will neither freeze nor dry out, large enough to contact a suitably large volume of earth, covering a sufficiently large area and in such a position that it is not influenced by other earthing systems. A large volume of earth reduces the current density in the soil and therefore the resistance to earth. A large area connection allows shaping of the electric field to be accomplished, reducing touch and step voltages. This is a clean earth – at least, as clean as it gets.
Problems arise as soon as equipment is connected to it. In practice, the cleanliness of the earth is affected by other, nearby, earthing systems and, usually more seriously, by the equipment of the installation itself.
The use of a combined protective earth and neutral (PEN) conductor, as used in a TN-C system, cannot be reconciled with the principles of good design outlined in this application note. In a TN-C system neutral currents - including third harmonics - and earth currents mix in neutral conductors, protective conductors and connected metalwork.
Installations should always be TN-S, even if they are derived from TN-C systems on the supply side of the point of common coupling (PCC). The presence of a single earth-neutral bond is very important.
Traditional installation practice focuses, correctly, on safety. Originally, it was thought sufficient to simply provide a low impedance path to earth. Modern practice requires ‘shaping’ of the field in the ground to control the voltage gradients around the earth electrode.
The ‘protective conductor’ must also provide a functional earth to the equipment operating on the system - that is, it has to provide a path for the leakage currents (at the fundamental frequency) and the high frequency noise currents arising from, for example, switched mode power supplies via radio frequency interference (RFI) filters as well as being a voltage reference for signal interfaces.
The magnitude of leakage currents varies around the installation. Since the earth leakage current originates mainly from single-phase equipment on each of the three phases, balanced components of the fundamental from each phase will tend to cancel, so that the current in the protective conductor may increase or decrease as circuits are combined along a distribution system. Often, it is worst at a (single phase) final circuit supplying IT equipment. Leakage currents are harmless while flowing to earth, but can easily reach lethal levels if the connection fails and therefore a high-integrity design is required. In essence this requires duplicate paths (each capable of carrying the full fault current) and robust and reliable connections – for example, long-life, corrosion-resistant, copper conductors installed by electricians rather than steel cable trays installed by building workers. Where the armour of cables is used as one of the routes, special attention is required to ensure that reliable connections are achieved and maintained at glands.
High integrity design principles must extend throughout the system, including right up to the desktop, by fitting sufficient socket outlets for example, so that extension blocks, with their single, low integrity, protective conductor, are not required.
High frequency currents can be a bigger problem as far as functionality is concerned. Much of the equipment that produces noise on the earth is also sensitive to it – but there is a difference; the equipment produces noise currents and it is sensitive to noise voltages. If the noise currents can be transported to earth without producing noise voltage drop, all will be well. This requires a connection to earth that has low impedance at all frequencies. To decrease radiated noise, the earth path for the noise current should run close to the supply conductors. It should be noted that in this context we are more concerned about the impedance of the connection to the earthing system, which represents the equipotential surface we colloquially call ‘earth’, rather than to the physical earth itself. This is different from the contexts of safety and lightning protection where the impedance to the earth itself is of critical importance.
When the amount of equipment installed was small it was common to run a separate large size earth lead straight back to the main earth terminal, or even to a separate earth rod (also bonded to the main earth terminal to comply with local regulations). This was usually satisfactory, partly because these systems and their peripherals were co-located in a geographically small area and so could be maintained at an equipotential (if there is such a thing), rather than at zero potential. The noise return path was also close to the supply conductors, reducing radiated noise. However, the long radial earth connections exhibit quarter-wave resonance1 effects that increase impedance at some frequencies, making this an unsuitable technique for modern widely distributed installations. Modern computer systems usually extend throughout several floors of a building. Maintaining an ‘equipotential’ (at high frequency) between these scattered devices requires a better solution.
It is a fact that most distributed computer systems work. As microelectronic devices have developed and operating voltages have reduced, the energy required to switch logic states and the immunity to voltage noise have generally decreased making them more sensitive to noise. The effect of this trend has been offset by improvements in system design to improve noise immunity. These measures include the use of differential interfaces and better software design, such as the use of error detecting and correcting protocols on networks. These techniques are very effective, but reduce network throughput by sending redundant (error control) data and requiring re-transmission of failed data packets. As the electrical noise increases, the error rate increases, and throughput decreases until useful communication ceases completely. To the user it appears as if the system has suddenly failed, whereas in fact it has merely degraded so far that the recovery mechanisms provided can no longer cope. If the electrical noise can be reduced to a low enough level, the error rate will reduce also and data transmission will again be possible. High noise levels reduce throughput by requiring repeat transmission and reduce efficiency. Clearly, network efficiency is related to data processing efficiency, which is related to business efficiency. As with many things, efficiency is worst when the need is greatest – when the network is busy. Reducing the level of electrical noise in the data processing environment is crucial to increasing efficiency. It is unfortunate that, in speculative developments, the most popular data cable for networks is unshielded twisted pair. For IT-intensive buildings and for 100 Mb/s data rates, the use of shielded twisted pair cable (STP) should be preferred.
The best way to reduce noise to a minimum is to use a copper grid ground plane. This technique was often used for ‘computer rooms’ when data processing was centralised and is still frequently the only viable solution. It works because there is an infinite number of paths through the grid with different apparent electrical lengths – while some of these paths may be multiples of a quarter wavelength, there will undoubtedly be many other parallel paths which are not. The result is a low impedance connection over a wide frequency range. Such a grid should cover the whole of the area of the installed equipment – these days usually the whole building – and it should not be forgotten that this applies to the vertical direction as well as the horizontal. There is little point in having horizontal meshes on every floor connected to a single vertical downlead. Grids are normally constructed using flat strip to keep skin effect to a minimum. Where structural elements are used as a grid, such as the supports for a raised floor that have been selected for their mechanical rather than electrical properties, it is important to ensure that the elements are electrically bonded together – using short copper braids – at each intersection.
It may be thought that a complete copper grid installation is rather expensive for ordinary commercial buildings – particularly in the case of speculative buildings. However, the cost is not great and it is obvious that the lowest overall cost is achieved by incorporating grids at the design stage, and that the most expensive route is to retrofit grids after occupation. An effective earthing system ensures that the building is suitable for a wider range of uses and is thus more marketable. The building can attract a higher rent, justified by the reduction in the frequency (and cost) of problems to tenants and the consequent operating costs.
Electromagnetic compatibility
Every piece of electrical and electronic equipment produces some electromagnetic radiation. Similarly, every piece of equipment is also sensitive, to a greater or lesser extent, to electromagnetic radiation. If everything is going to work, the cumulative level of radiation in an environment must be rather less than the level that will disrupt the operation of the equipment working in that environment. To achieve this goal, equipment is designed, built and tested to standards to reduce the amount of radiation that is emitted and increase the amount that can be tolerated.
EMC is defined in the IEC 61000 series as:
‘The ability of an equipment or system to function satisfactorily in its electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.’
Maintaining this compatibility in practice requires great care in the design and implementation of the installation and the earthing system. Only a general overview only is presented in this document.
In traditional electrical engineering separate earthing systems were used, for example, signal earth, computer earth, power earth, lightning earth etc. In today’s electrical engineering new insights have been gained on the aspect of earthing and grounding and its relation to instrument protection. The concept of separate earthing systems has been abandoned and the international standards now prescribe one overall earthing system.
There is no such thing as ‘clean’ and ‘dirty’ earth.
This single earthing concept means in practice that protective earth (PE) conductors, parallel earthing conductors, cabinets and the shields and screens of data or power cables are all interconnected. Also steel construction parts and water and gas pipes are part of this system. Ideally all cables entering a zone must enter at one point at which all screens and other earth conductors are connected.
To reduce interference on equipment the earthing loops between cable-screens and other earthing structures must be kept small. Bonding cables against metal structures makes these structures act as parallel earthing conductors (PEC). Parallel earthing structures are used both for data and power cables.
Examples are, in ascending order of effectiveness: earthing wires, cable ladders, flat metal surfaces, cable trays or ultimately metal pipes. The PEC reduces the impedance of the loop formed by the cable and the earthing network. The earthing resistance to mother earth is mostly not important for the protection of equipment. A very effective form of a PEC is a densely woven or completely closed cable screen with a large metal cross-section, connected all around at both ends of the cable.
To keep the impedance of bonding connections in the earthing network small for high frequencies, litz wire (stranded, individually insulated) or metal strips with a length to width ratio smaller than 5 must be used.
For frequencies higher than 10 MHz round wires should not be used.
A raised floor can serve as a good equipotential plane. The copper grid underneath it must have a maximum spacing of 1.2 metres and be connected to the common bonding network via many equipotential bonding conductors. The grid should be connected to a 50 mm sq copper ring placed around the raised floor area, within the boundaries of the floor, at 6 metre intervals. Power and signal cables should be at least 2oomm apart and where they cross, they should do so at right angles.
Conclusion
The earthing system of a building or site is a critical part of the electrical infrastructure and can determine the future viability of businesses operating in it. It is required to deal with short duration fault currents of several hundred Amperes, standing currents of a few Amperes and high frequency noise currents returning them to source or ground with close to zero voltage drop for noise currents and with no risk of damage for fault currents. At the same time, it must protect the equipment and personnel housed in the building during lightning strikes (fast transients in the kiloampere region) in the interconnected earthing system.
The design of the earthing system of a building, including the lightning protection system, requires great care if all the objectives are to be met. It is, as usual, best and cheapest if it is designed correctly from the start, considering the lifetime of the building and, as far as possible, the potential usage during that lifetime.
Re-engineering after the building has been occupied is always an expensive exercise.
Posted in shielded twisted pair cable (STP), Electromagnetic compatibility, protective earth (PE), radio frequency interference (RFI), equipotential earth, point of common coupling (PCC), clean earth, protective earth and neutral (PEN), TN-C, third harmonics, Earthing | No Comments »